Whatever you set along the line, its only job is to make the wall carry the sheet.
A 4x8 siding panel is held by supports set at its marked starting height, and crews use one of five things: nails tacked part way at that height, scrap cleats screwed to the wall, a screwed ledger board, temporary panel clamps, or siding hooks attached at the same height. The first three are free and the trade-off is that each has to be leveled, fastened and removed on every course, and a ledger leaves fastener holes in the finished face. The point of all five is the same: get the wall carrying the sheet instead of the crew.
The whole job comes down to one question: what is holding the sheet while you fasten it? Get that right and two people set a full sheet without fighting it. Get it wrong and you are wrestling a full sheet against a wall with no hands left to reach for a nail gun.
Where does the nail go?
The most common thing we hear is that a tack nail already does this. It does, on the sub sheeting, and the first detail below says so plainly. The finished siding course is the one place it runs out of wall, and that is the detail these hooks were built for.
One wall, four details. The tack nail does its job on the sub sheeting and runs out of room on the finished course.
Sub sheeting
A tack nail fits in the seam or is nailed into the green plate supporting the subsheeting.
Finished siding
A tack nail does not allow a siding sheet to hang past the top of the foundation, unlike the EZpanl hook.
With the hook
The bottom edge rests on the saddle while the crew positions and fastens the panel. Two person job.
Removing the hook
Once the sheet is raised up and fastened, it will leave clearance to tap the hook up to remove it off the nail and use a block of wood to drive the nail in behind the siding.
Always follow the siding manufacturer's flashing, water-resistive-barrier, fastening, clearance, and installation requirements. Designed for the panel products and conditions listed in the current EZpanl instructions. Minimum two-person crew.
Step 1. Mark the starting height
Mark the required starting height where the bottom edge of the course will sit. Use a level or a laser rather than measuring off the foundation, because foundations are not reliably level and the error compounds into every course above.
Step 2. Give the sheet something to rest on
This is the step that matters. The wall should carry the weight, not a person. Five ways crews do it, and what each one costs you:
Tacked nails
Drive a few nails part way at the marked height and rest the sheet on them. This is free and immediate, but you pull and re-drive the nails on every course.
Scrap cleats
Offcuts screwed to the wall along the line. More surface for the sheet to sit on than a nail head. You are cutting, leveling and removing them each course.
A screwed ledger board
A straight board run along the line. The most stable of the improvised options and the easiest to level. It has to be fastened and removed on every course, and it leaves fastener holes in the finished face that need attention. More on ledger boards here.
Flashing clamps
Panel clamps provide two temporary support points and move from course to course without leaving wall-fastener holes. Confirm the wall assembly and installation method against the clamp manufacturer's current instructions.
Siding hooks
Purpose-built hooks that nail along the line, each with one fastener, and hold the bottom edge of the sheet across the row rather than at two points. They mount independently of the flashing. That is what we make, covered below.
Two sets of hands, one at each end. This is the part no support tool removes.
Step 3. Lift and set the bottom edge down
Two people, one at each end, lifting from the ground rather than from a stooped position. Set the bottom edge down onto whatever you put along the line. The sheet is now held at the right height. A 4x8 sheet runs roughly 38 lb to 77 lb depending on the product, and we put every published figure with its source here.
Step 4. Check before you commit
Plumb the vertical edge and confirm the bottom edge is still on your line. Nothing about this gets cheaper after the first fastener goes in.
Step 5. Nail it off
The wall is carrying the sheet. Follow the fastener schedule in your panel manufacturer's instructions, which govern.
Step 6. Remove the supports and move up a course
They sit where the next sheet needs to go, so how fast they come off is part of the job rather than a detail.
Where EZpanl fits
Our 16-piece siding hook kit is 16 powder-coated 11-gauge steel hooks and one EZhandle. The hooks nail to the wall at the marked support height through the angled slot, using the fastener called out in the current EZpanl instructions. The bottom edge of the sheet rests on the saddles, the blades sit behind the panel once it is set, and only the saddles show below the bottom edge. To release, tap up on the exposed bottom of the hook and it comes off the nail.
Compared with the improvised options, you get the same line on every course instead of re-leveling each time, and nothing to unscrew from the finished face. Consult the current EZpanl instructions for the panel products and conditions it is approved for.
It is not a way to work alone. Our published safety guidance requires a minimum of two people at all times and states that the tool is not a replacement for a second worker. We wrote about the solo question here.
What goes wrong
- The sheet drifts after the first fastener. Usually because it was taking its own weight on the fasteners rather than resting on something.
- The line was measured off the foundation. The error shows up three courses later and there is no good fix by then.
- Nobody checked plumb before nailing off. The first sheet sets the wall.
- Supports removed too early. Leave them until the sheet is fastened to the schedule, not until it feels held.
Questions crews ask
What holds a 4x8 panel while you nail it?
Whatever support you set at the marked height. Tacked nails, scrap cleats, a screwed ledger board, flashing clamps, or siding hooks. The point of all of them is to get the wall carrying the sheet instead of the crew.
How heavy is a 4x8 siding panel?
Roughly 38 lb to 77 lb depending on the product. Every published figure we could find, with its source, is on the panel weights page.
Can you hang a 4x8 panel alone?
People do, and some tools are marketed for it. Our own instructions require a minimum of two people at all times. We wrote about it here.
Do you start at the bottom or the top of the wall?
Bottom. Every course above inherits the line you set on the first one.
Do the supports have to come off before the next course?
Yes, they sit where the next sheet needs to go. So how fast they come off is part of the job, not a detail.
