Home / How it works

Set the hooks. Lift the sheet. Nail it off.

Short answerLine up the gauge on each hook with the top of the concrete foundation and nail it on, one nail per hook. Set the sheet on the hooks, lift it to your line with the EZhandle, and set 4 to 5 nails about 4 feet up to secure the sheet. Tap up on each hook to release it, then move it to the next sheet. The hooks also hang sub sheathing: nail them into a stud.
EZpanl install video2:25

Watch the full install

The 2:25 install video walks the whole job. Watch it before your first sheet, then use the steps below on the wall.

Want it on paper? Quick Start guide (PDF), one page, the same card that comes in the box.

A row of red EZpanl hooks nailed along the top of the concrete foundation

Set the hooks

Line up the gauge on each hook with the top of the concrete foundation and put one 8d sinker through the angled slot. Set all your hooks before the first sheet, then put one hook on the EZhandle. That's what you lift the sheet with.

A full sheet resting on the hooks

Set the sheet

Carry the sheet over and set it right on the hooks, without ever setting the edge down in the dirt.

Installer with the EZhandle at the bottom of a sheet resting on the hooks

Lift it to your line

Lift the sheet off the hooks with the EZhandle into the proper position.

Nailing off the bottom of the sheet

Nail it off

The wall carries the weight while you work. Set 4 to 5 nails to secure the sheet around 4 feet up. Stay away from the bottom of the sheet until the hooks are out.

Tapping a hook up off its nail below a fastened sheet

Pop the hooks

Tap the hooks up and they fall right off. Pop them out right away, or wait until you've done a few sheets.

Tapping the hook nail in behind the siding with a block of wood

Block the nail in

The hook nail is still sticking out a little. Put a block of wood over it and tap it in behind the siding, then nail the bottom of the sheet off. Move the hooks on to the next sheets.

One piece of steel

No moving parts.

The nail slot. An angled slot open at its lower end. One 8d sinker nail passes through it into the wall.

The gauge. Built into the side of the hook. Line it up with the top of the concrete foundation and nail the hook on.

The blade. Cold rolled steel, 1.25 in. wide, 11 gauge, powder coated bright red, so a dropped hook is easy to find.

The saddle. The strap bends out into a small ledge and turns back up into a shallow cradle. The panel's bottom edge sits down inside it.

Why it releases. Tap up on the hook and the nail travels down the slot and out through the mouth. The nail stays in the wall, behind the installed panel.

One EZpanl hook
Where the nail goes: sub sheathing, finished siding, with the hook, removing the hook

Why a tack nail runs out of wall

A tack nail does its job on the sub sheathing. Finished siding has to hang past the top of the foundation, and that's where a tack nail runs out of wall. The hook was built for that detail.

Once the sheet is raised and fastened, there's clearance to tap the hook up off its nail and use a block of wood to drive the nail in behind the siding.

Nail, 2x4 or hooks?

The 16-piece kit

16 hooks + 1 EZhandle · $199 one time · 30-day returns

Always follow the siding manufacturer's flashing, water-resistive-barrier, fastening, clearance and installation requirements. Safety and liability.